Skip to content
imonga
Back to projects
Delivered
Retail / Mall

Mall of Africa

imonga has checked that the developer's company exists and that the listing is consistent. This is not a guarantee about the project or its delivery.

Checked by imonga before October 2026 · date not documented · valid until Apr 21, 2027

Waterfall City, Midrand, South Africa

Delivery

2016

About the project

A large single-phase shopping mall in Southern Africa

Opened on 28 April 2016 at the heart of Waterfall City in Midrand, the Mall of Africa is a single-phase shopping centre in Southern Africa. Developed by Atterbury on behalf of JSE-listed REIT Attacq, it offers roughly 131,000 m² of retail lettable area and more than 300 stores across two main levels. The mall features an open-air restaurant plaza connecting directly to Waterfall City Park, the green heart of the precinct. From opening day it drew tens of thousands of shoppers and established itself as a major retail hub on the Midrand corridor between Sandton and Pretoria. Its location along the N1 highway, near the Midrand Gautrain station and three airports including O.R. Tambo International, makes it accessible across Gauteng. Fashion, dining, leisure, services and anchor stores coexist in a contemporary architectural setting that catalysed the development of Waterfall City.

  • 131,000 m² of retail lettable area
  • More than 300 stores across two levels
  • Open-air restaurant plaza opening onto Waterfall City Park
  • Direct access to the N1 highway and Midrand Gautrain station
  • Single-phase mall in Southern Africa

Launched in 2016

Available unit types

Shop

Amenities & features

Shopping

Parking

24/7 security

Green spaces

Location & surroundings

Waterfall City, Midrand, Gauteng

Waterfall City is a mixed-use urban precinct on the Midrand corridor between Sandton and Pretoria, valued at over R14 billion and a creator of thousands of jobs.

Midrand Gautrain Station

3 km

O.R. Tambo International Airport

30 km

Frequently asked questions about Mall of Africa

When will Mall of Africa be delivered?

The stated delivery date is 2016, and the development is currently marked "Delivered". When buying off-plan, have the delivery date and late-delivery penalties written into the contract.

Who is building Mall of Africa?

Mall of Africa is being developed by Attacq. Their Imonga directory page lists their contact details and other developments.

Where is Mall of Africa located?

Mall of Africa is located in Waterfall City, Midrand, South Africa, at the stated address: Waterfall City, Midrand, Gauteng.

Developer

Attacq is a JSE-listed REIT and development partner of Waterfall City, an urban precinct spanning over 527,000 m². The mall was delivered by developer Atterbury.

This developer's contact details are not shared. Write to them using the form below: they reply to you directly.

Learn more about this development

Your request is passed on to the developer, who replies to you directly. No commitment.

No need to create an account: your email address is enough. We send you a code to confirm it, you type it here, and your request is sent.

The reply will reach you at this address.

Free, no commitment. A 6-digit code is emailed to you to confirm your address; your details are only shared with your request.

Have a password? Sign in

Are you the developer of this project?

This listing was compiled from public sources. Claim it to correct the information, upload your brochure and receive buyer enquiries.

Claim this listing

More projects by Attacq

Ellipse Waterfall
Under construction

Ellipse Waterfall

Midrand

From R 1,490,000

Gateway East
Under construction

Gateway East

Midrand

Price on request

Deloitte Head Office
Delivered

Deloitte Head Office

Midrand

Price on request

PwC Tower
Delivered

PwC Tower

Midrand

Price on request

Waterfall City
Under construction

Waterfall City

Midrand

Price on request