JAHI, Abuja, Nigeria
VIXION VI in Jahi offers five modern penthouses with premium amenities and secure services.
From
250 M ₦
250 M ₦
From
5
Units
2027
Delivery






VIXION VI (JAHI) is an ongoing residential project developed by NesVixion in Abuja. The complex includes penthouses with premium finishes. It is built with a frame structure, uninterrupted water supply and continuous electricity. The site provides full fibre optic connectivity, solar water heating and electric vehicle charging stations. Residents have access to a swimming pool, an indoor gym, a clubhouse, centralized security control and underground parking.
| Type | Beds | Size | From |
|---|---|---|---|
| Penthouse | — | — | 250 M ₦ |
| Penthouse | — | — | 250 M ₦ |
| Penthouse | — | — | 250 M ₦ |
| Penthouse | — | — | 250 M ₦ |
| Penthouse | — | — | 250 M ₦ |
Start Date
2026-06-29
End Date
2027-06-30
Prices shown on this page start at 250 M ₦. The figure comes from the source cited at the bottom of the page: have the developer confirm it in writing before paying anything.
The stated delivery date is 2027, and the development is currently marked "Under construction". When buying off-plan, have the delivery date and late-delivery penalties written into the contract.
VIXION VI (JAHI) is being developed by NesVixion Properties Limited. Their Imonga directory page lists their contact details and other developments.
VIXION VI (JAHI) is located in JAHI, Abuja, Nigeria, at the stated address: Suite C11, Second floor, Silver Line Plaza, Garki 2, Abuja.
This page lists 5 homes.
Thinking of buying off-plan? Guarantees, payment schedule and risks: read our guide.
5 units in total, 5 still available.
Price
250,000,000 NGN
| Unit | Type | Price | Status | |
|---|---|---|---|---|
L01 | Penthouse | 250,000,000 NGN | Available | |
L02 | Penthouse | 250,000,000 NGN | Available | |
L03 | Penthouse | 250,000,000 NGN | Available | |
L04 | Penthouse | 250,000,000 NGN | Available | |
L05 | Penthouse | 250,000,000 NGN | Available |
Prices and availability as provided by the developer. Confirm with them before committing.
The stages announced by the developer, and those actually completed.
Start Date
planned June 2026
End Date
planned June 2027
Dates as provided by the developer. Any gap between the planned and actual dates is shown here on purpose.
This developer's contact details are not shared. Write to them using the form below: they reply to you directly.
Your request is passed on to the developer, who replies to you directly. No commitment.
To write to the developer, log in or create your free space. It takes a minute, and you come straight back here.
Create my spaceI already have an accountFree, no commitment. Your details are only passed on with your request.
Are you the developer of this project?
This listing was compiled from public sources. Claim it to correct the information, upload your brochure and receive buyer enquiries.
Claim this listingUnder construction
Apartment complex
Launched in 2026