Skip to content
Back to projects
Under construction
Residential

Victoria Nest 2

Lekki, Lagos, Nigeria

From

₦114,950,781 to ₦148,759,834

Source price: US$85,000, converted at the 14 Nov 2026 rate

Floors

20

“From” price: the developer has not stated what it includes (VAT, notary fees, parking…).

About the project

Victoria Nest 2 offers modern duplexes with a vertical garden and collaborative spaces in Lekki.

Victoria Nest 2 is a completed residential project by Nedcomoaks Group Limited, located on Chevron Drive in Lekki, Lagos. The building consists of twenty floors, including two underground parking levels. The duplex units feature a vertical garden façade, collaborative workspaces, and an energy‑efficient HVAC system. The complex offers amenities such as a gym, swimming pool, 24/7 security, a playground, and parking. It is close to the coast, a university, a supermarket, a park, a railway station, an airport, a bus station, a bank and a hospital.

  • Vertical garden façade
  • Collaborative workspaces
  • Energy‑efficient HVAC system
  • 20 floors with underground parking
  • Gym, pool and 24/7 security

Launched in 2022

Available unit types

Duplex

Construction progress

The stages announced by the developer, and those actually completed.

0% complete

Commencement

planned April 2022

Overdue

Completion

Upcoming

Dates as provided by the developer. Any gap between the planned and actual dates is shown here on purpose.

Amenities & features

Gym

Pool

24/7 security

Playground

Parking

Project phases

  1. Commencement

    2022-04-22

  2. Completion

Location & surroundings

Chevron Drive, Alt. Route, Lekki, Lagos

Coast (300 m)

University (750 m)

Supermarket (500 m)

Park (1 120 m)

Railway station (1 750 m)

Airport (3 158 m)

Bus station (450 m)

Bank (415 m)

Hospital (350 m)

Frequently asked questions about Victoria Nest 2

How much does Victoria Nest 2 cost?

Prices shown on this page range from ₦114,950,781 to ₦148,759,834, converted at today's rate from the currency of the source cited at the bottom of the page: have the developer confirm them in writing before paying anything.

Who is building Victoria Nest 2?

Victoria Nest 2 is being developed by Nedcomoaks Limited. Their Imonga directory page lists their contact details and other developments.

Where is Victoria Nest 2 located?

Victoria Nest 2 is located in Lekki, Lagos, Nigeria, at the stated address: Chevron Drive, Alt. Route, Lekki, Lagos.

Thinking of buying off-plan? Guarantees, payment schedule and risks: read our guide.

Developer

This developer's contact details are not shared. Write to them using the form below: they reply to you directly.

Learn more about this development

Your request is passed on to the developer, who replies to you directly. No commitment.

No need to create an account: your email address is enough. We send you a code to confirm it, you type it here, and your request is sent.

The reply will reach you at this address.

Free, no commitment. A 6-digit code is emailed to you to confirm your address; your details are only shared with your request.

Have a password? Sign in

Are you the developer of this project?

This listing was compiled from public sources. Claim it to correct the information, upload your brochure and receive buyer enquiries.

Claim this listing

More projects by Nedcomoaks Limited