Tétouan, Morocco
Al Houria III, 2‑bedroom apartments starting at 1,125,000 DH, delivered in 2025 in Tetouan.
From
1.1 M MAD
1.1 M MAD
From
8
Units
2025
Delivery
5
Floors

Al Houria III is an apartment complex located on Route de Sebta in Tetouan. The development includes eight 75 m² apartments spread over five floors. Each unit features two bedrooms, a fitted kitchen, air‑conditioning and an elevator. The project is developed by Groupe AAFER Immobilier with delivery scheduled for 2025.
| Type | Beds | Size | From |
|---|---|---|---|
| Apartment | 2 | 75 m² | 1.1 M MAD |
Construction
2024
Livraison
2025
Route de Sebta, 1er Rond-point de Marjane, en face Hôtel El Yacouta
Marjan Tétouan (3 min à pied)
Mosquée Rabii (1 min à pied)
OFPPT Saniat R'mel (5 min à pied)
Cafés & Restaurants (5 min à pied)
Aéroport de Tétouan (10 min en voiture)
Ikea (10 min en voiture)
Carrefour (6 min en voiture)
Martil
Prices shown on this page start at 1.1 M MAD. The figure comes from the source cited at the bottom of the page: have the developer confirm it in writing before paying anything.
The stated delivery date is 2025, and the development is currently marked "Sold out". When buying off-plan, have the delivery date and late-delivery penalties written into the contract.
AL HOURIA III is being developed by Groupe AAFER Immobilier. Their Imonga directory page lists their contact details and other developments.
AL HOURIA III is located in Tétouan, Morocco, at the stated address: Route de Sebta, 1er Rond-point de Marjane, en face Hôtel El Yacouta.
This page lists 8 homes, over 5 floors.
Thinking of buying off-plan? Guarantees, payment schedule and risks: read our guide.
1 units in total, 0 still available.
Price
1,125,000 MAD
Per square metre
15,000 MAD
| Unit | Type | Area | Bedrooms | Price | Price / m² | Status | |
|---|---|---|---|---|---|---|---|
L01 | Apartment | 75 m² | 2 | 1,125,000 MAD | 15,000 | Sold |
Prices and availability as provided by the developer. Confirm with them before committing.
The stages announced by the developer, and those actually completed.
Construction
Date annoncée : 2024
Livraison
Date annoncée : 2025
Dates as provided by the developer. Any gap between the planned and actual dates is shown here on purpose.
This developer's contact details are not shared. Write to them using the form below: they reply to you directly.
Your request is passed on to the developer, who replies to you directly. No commitment.
To write to the developer, log in or create your free space. It takes a minute, and you come straight back here.
Create my spaceI already have an accountFree, no commitment. Your details are only passed on with your request.
Are you the developer of this project?
This listing was compiled from public sources. Claim it to correct the information, upload your brochure and receive buyer enquiries.
Claim this listingSold out
Apartment complex
Launched in 2024